Risk assessment of euro tunnel

Risks breakdown structure 17 fold of is presented in Table 1 Edalati Pour, M. Shareholders in the Company Operating the concession for the tunnel have witnessed significant loss of value in their equity stake in the company.

Since there was no natural owner for the project, the banks felt that the chance of getting a significant portion of equity into the scheme was slim. This division has largely based on the time and Risk assessment of euro tunnel of life is an underground structure.

Risk acceptance criteria for use in risk quality assessment Risk acceptance criteria for use in risk quantitative assessment Contract review phase Requirements contained in the documents Risk assessment to estimate Items risk of contracting Risk Breakdown Structure Risk breakdown structure is a hierarchical structure of project risks and can be used to structure and guidance of the risk Risk assessment of euro tunnel process.

Concrete cover corrosion or erosion of rocks bolt over time inadequate durability Collapse stone blocks or the topical falling due to unstable rock mass Seal break Deformation of large reptile in rocks salt or erosion time function Instability Of time function in foundation stone among caverns The risk of occurrence of these cases returns to the employer and the contractor.

Using this method RBS could be helped to do so because of it play an important role in the process of identifying and risk structure Kyvanlu, and Atash Fraz, R. Management Risk Unrealistically goals-Poor control-Organizing-Improper distribution of financial resources, human and material-The lack of definition of the tasks involved in the project-No use of techniques and techniques of project management.

Legal risk Permissions and Confirmations-Changes in laws and regulations-standards and requirements of Environmental 5.

See more project management case studies at www. Risks construction and design The risk of operation and maintenance Other risks such as changes in the law, tax Dud deck the risk of underground spaces projects is dividing in three categories: Schedule inaccurate and unrealistic-Change in the timing of completion of the project-Concurrency works and payments-Force Majeure-Business interruption and suspension-The uncertainty of the limitations and constraints in planning-The delay in the final approval-Scheduled by the Employer Adviser-The delay in the delivery of land and resources.

Claims of Emma arose between Routinely and the contractors. Routinely continuously monitors PH. Identification and classification of risks in tunneling projects In discussion of risk management the important point is the identification and classification them at first.

Considering the extent of various risks therefore their management will be very diverse. Process management represents a suitable tool towards this end.

Political risk Foreign and domestic policy- government relationship- Change in government policies- Elections- Internal and external threats- The effect of applied pressure groups and interest groups-Potential changes with pressure groups and opposition political stability -Possibility of confiscation of property or nationalization-Changing expectations of the political events Wars, revolutions, coups, etc.

Whereas formerly a distinction was drawn between secondary and primary obligations, in the interim secondary obligations enjoy the same status as primary ones, i. According to WBS could Constitute foundation for many aspects of project management, RBS also could be applied for structure and guidance of process of risk management.

The timetable set by the two governments was tight. Considering the extent of various risks therefore their management will be very diverse. Technology factors are associated with human engineering activities. Factors influencing technical risk Technical risks: Thatcher and President Integrand announced their enthusiasm for a fixed link between their two countries, provided it was financed, built and operated by the private sector.

It is actively contributing to the development of renewable energy sources. Consequences for Management As far as these new requirements for a verifiably functioning and eff ective internal control system are concerned a completely new dimension and significance have been created for conceptional, process-oriented construction management and process-oriented work for all project phases.

Conflicts were high; teamwork was never particularly good and declined to the point in mid that Routinely was even barred from access to the works by the contractors. Illegal immigrants and asylum seekers had been known in the past to use the tunnel to enter Britain causing a minor diplomatic row over the sitting of the Generates refugee camp which was eventually closed in In the service tunnels broke through at the halfway point.

However, as a business project it has undoubtedly been a failure.

Risk analysis for tunneling projects

Management Risk Unrealistically goals-Poor control-Organizing-Improper distribution of financial resources, human and material-The lack of definition of the tasks involved in the project-No use of techniques and techniques of project management. It is a good reminder that in making strategic forecasts of benefits or results you should bear in mind how competitors will react to the project you are envisioning.

The combined geologic prediction - decision support model was then applied to the Porto Metro, in Portugal. Technical risk Design and Implementation The effective factors of risk listed in the table 2.

Seen from the internal point-of-view these risks relate to a possible loss of the right to claim for additional services owing to hindrances and extended construction times. Risks breakdown structure 17 fold of is presented in Table 1 Edalati Pour, M. Km long tunnel has fulfilled this old dream by linking Britain and the rest of Europe.

More significant, however, is the ability of the model to predict changes in geology and consequently changes in construction strategy. This work recognized the management area. Sets of tunneling projects risk have been classified in two categories of internal and external risks consist of seventeen levels according to the RBS method.

Cognition risks design and construction steps are essential stage in project which should be do it at first because of created a good reference for all groups owners, designers, companies insured and parties to the contract. First level of RBS could be used as a useful tool in preparing the list of risks to ensure that in risk identification phase, all RBS of project risks covered.

The aim is by means of defined sequences, standards and tools to ensure that the success of the project is as little infl uenced as possibleby individual activities of a personal nature on the construction site.Identify and Analyze the Risks Involved in Tunnel Projects Mohammad Ali Gafari 1 * and Rahim Aminzadeh 2 1 Master student of construction management and engineering, Azad university of Sirjan research science.

Risk management of tunnel construction projects Doctoral Thesis Ing.

Current World Environment

Olga Špačková Prague, June Ph.D. Programme: Civil Engineering Supervisor: Prof. Ing. Jiří Šejnoha, DrSc. Euro) > 30 3 to 30 to 3 to Travel with Eurotunnel le shuttle - Folkestone to Calais in just 35 minutes. Up to 4 shuttles per hour, and direct motorway access. Book now from just £30 per car, each way.

Euro) > 30 3 to 30 to 3 to Risk Management System and internal Control System Until it was “only” necessary to set up an appropriate risk management system (RMS) relating to the .